call us now: 01425 614546




call us now: 01425 614546


delivering construction excellence

Arabella_Court
  • canal_walkcanal_walk
  • canal_walkcanal_walk
  • canal_walkcanal_walk
  • canal_walkcanal_walk
  • canal_walkcanal_walk

go back

EA offices & workshop | romsey



Client:
The Environment Agency
Architect:
Q P Architecture
Quantity Surveyor:
Robert Jackson Associates
Structural Engineer:
Smith Foster Ltd
Construction Period:
42 weeks
Works value:
£2.54m
Procurement Route:
Competitive tender

project scope

This project comprised the demolition of the existing office and workshop and design and build of replacement offices and workshops totalling 840 m2. Access to the site was restricted - comprising an existing public footpath and narrow vehicular route which passed under a railway arch with a maximum headroom of 8'6". All materials had to be delivered and distributed under this arch, whilst in constant use by the public. The building has achieved a BREEAM rating of 'Excellent'. In order to achieve this rating state-of-the-art mechanical and electrical systems were designed and installed to include high efficiency heating, solar panels, heat recovery air handling, lighting controls and rainwater harvesting.

A detailed procurement process was developed and implemented to ensure maximum re-use/recycling of materials. This, together with responsible sourcing of all other elements, ensured minimum impact to the environment whilst still providing an excellent standard of accommodation.




recent projects

get in touch

Drew Construction Group:
Herbert H Drew & Son Ltd | Drew Properties (New Milton) Ltd | Drew Holdings Ltd
11-15 Station Road | New Milton | BH25 6HN
©Drew Holdings 2017 all rights reserved
website design jan downer
Drew Construction Group:
Herbert H Drew & Son Ltd
Drew Properties (New Milton) Ltd
Drew Holdings Ltd
11-15 Station Road | New Milton | BH25 6HN
©Drew Holdings 2017 all rights reserved
website design jan downer