call us now: 01425 614546




call us now: 01425 614546


delivering construction excellence

Pavilion_Drama
  • Pavilion_dramaPavilion_drama
  • Pavilion_dramaPavilion_drama
  • Pavilion_dramaPavilion_drama
  • Pavilion_dramaPavilion_drama
  • Pavilion_dramaPavilion_drama
  • Pavilion_dramaPavilion_drama

go back

pavilion drama centre | bournemouth



Client:
Bournemouth Borough Council
Architect:
Baqus
Employer's Agent:
Baqus
Structural Engineer:
B E Willis
Construction Period:
26 weeks
Works value:
£1.3m
Procurement Route:
Competitive tender

project scope

This project required complex alteration and refurbishment works within the Grade II listed Bournemouth Pavilion, to form a Centre for Drama, and followed our previous successful completion of the Dance Centre, also within the Pavilion. Works called for the construction of a new glazed entrance, and works to the disused space occupying the former bakery and kitchen on lower levels, including a double height room below the upper side terrace of the building. The new Centre includes two studios, offices, auditorium and associated areas.




recent projects

get in touch

Drew Construction Group:
Herbert H Drew & Son Ltd | Drew Properties (New Milton) Ltd | Drew Holdings Ltd
11-15 Station Road | New Milton | BH25 6HN
©Drew Holdings 2017 all rights reserved
website design jan downer
Drew Construction Group:
Herbert H Drew & Son Ltd
Drew Properties (New Milton) Ltd
Drew Holdings Ltd
11-15 Station Road | New Milton | BH25 6HN
©Drew Holdings 2017 all rights reserved
website design jan downer