call us now: 01425 614546




call us now: 01425 614546


delivering construction excellence

Ridgeway_barns
  • ridgeway_barnsridgeway_barns
  • ridgeway_barnsridgeway_barns
  • ridgeway_barnsridgeway_barns
  • ridgeway_barnsridgeway_barns
  • ridgeway_barnsridgeway_barns
  • ridgeway_barnsridgeway_barns

go back

ridgeway barns | whitchurch



Client:
Middleton & Portway Estates
Architect:
Bays Curry McCowen
CDM Co-ordinator:
Bays Curry McCowen
Structural Engineer:
White Royall Ltd
Construction Period:
47 weeks
Works value:
£760k
Procurement Route:
Competitive tender

project scope

Ridgeway Barns was an existing collection of dilapidated flint/brick farm buildings located on the Middleton & Portway Estate. Our works comprised the complete refurbishment of the existing buildings including complete roof replacement, installation of new intermediate steel framed floor structures and structural underpinning. Areas of existing brick and flint walling were reconstructed and roof coverings utilised the existing slates.

Internally, the barns were remodelled to provide three high specification and unique residential units, maintaining as much of the existing structure and features as possible. Individual gardens and landscaped areas were created from the existing farmyards.




recent projects

get in touch

Drew Construction Group:
Herbert H Drew & Son Ltd | Drew Properties (New Milton) Ltd | Drew Holdings Ltd
11-15 Station Road | New Milton | BH25 6HN
©Drew Holdings 2017 all rights reserved
website design jan downer
Drew Construction Group:
Herbert H Drew & Son Ltd
Drew Properties (New Milton) Ltd
Drew Holdings Ltd
11-15 Station Road | New Milton | BH25 6HN
©Drew Holdings 2017 all rights reserved
website design jan downer